Manager Wind Construction Electrical Balance Of Plant
Talentmate
Philippines
21st June 2026
2606-9279-138
Job Description
Job Summary
This is a site‑based role responsible for overseeing and monitoring all Electrical Balance of Plant (BOP) construction activities for a utility‑scale wind farm project. The role includes supervision of cabling, substations, and transmission line works; coordination with contractors, utilities, and grid operators; management of QA/QC processes; and support of contract, schedule, risk, and safety management to ensure delivery in accordance with project specifications, standards, and timelines. Willingness to be site‑based in Rizal or Quezon Province is required.
Key Responsibilities
Monitor and control the BOP contractor’s work associated with cabling, substation, and transmission line establishment for a major scale wind farm
Support with the contractor and authorities’ communication for all electrical scope related aspects
Manage own team of site-based Quality Controller and Electrical Engineer
Assist in management and oversight of Grid Connection Agreements and the respective grid operators and their scope
Support the development and implementation of Contract Management Plans for the relevant contractors
Ensure that the entire scope of work of all contractors is delivered as per specifications and on time
Support and monitor the interface between different contractors
Verify contractors’ formal acceptances of deliveries from subcontractors / suppliers
Run a daily log of events that may be relevant for contractual discussions and disputes later
Ensure that the Basis for Design is adhered to in full
Support the approval of the suppliers’ quality plans
Verify all contractor deliveries meets the quality specifications and establish and maintain the QA records of the same
Support the approval of milestone deliveries
Support the implementation and follow-up of appropriate risk management and environmental protection measures
Evaluate the consequences of activities for risk impact on cost and plan
Monitor work progress vs. schedules and act accordingly in case of delays
Interact with Technical and Author Supervision representatives
Monitoring compliance with technological processes during construction
Verify As-Built documentation
Participate in Permit to Works meetings with subsequent sign-off of PtWs
Provide daily progress reports in coordination with contractors
Accept work progress on the site
Execute checks of documents availability confirming quality characteristics of designs, products, materials, and equipment, used during construction of an object – technical passport, certificate, lab tests results certificates etc.
Sign Acts of completed works from contractors
Demonstrate Safety Leadership by example
Participate, contribute, and provide leadership in toolbox talks, safety inductions and risk assessments.
Prerequisites
Must be a licensed Electrical Engineer.
Minimum of 5 years of relevant construction engineering experience in power generation projects.
Prior experience in wind power projects is preferred.
Strong knowledge of the Philippine Grid Code, Philippine Electrical Code (PEC), and international electrical standards.
Experience working with utilities and transmission companies.
Proven experience in contract administration and QA/QC management.
Strong coordination, documentation, and stakeholder management skills.
Willingness to be assigned on‑site for the duration of the project.
Searching, interviewing and hiring are all part of the professional life. The TALENTMATE Portal idea is to fill and help professionals doing one of them by bringing together the requisites under One Roof. Whether you're hunting for your Next Job Opportunity or Looking for Potential Employers, we're here to lend you a Helping Hand.
Disclaimer: talentmate.com is only a platform to bring jobseekers & employers together.
Applicants
are
advised to research the bonafides of the prospective employer independently. We do NOT
endorse any
requests for money payments and strictly advice against sharing personal or bank related
information. We
also recommend you visit Security Advice for more information. If you suspect any fraud
or
malpractice,
email us at abuse@talentmate.com.
You have successfully saved for this job. Please check
saved
jobs
list
Applied
You have successfully applied for this job. Please check
applied
jobs list
Do you want to share the
link?
Please click any of the below options to share the job
details.
Report this job
Success
Successfully updated
Success
Successfully updated
Thank you
Reported Successfully.
Copied
This job link has been copied to clipboard!
Apply Job
Upload your Profile Picture
Accepted Formats: jpg, png
Upto 2MB in size
Your application for Manager Wind Construction Electrical Balance Of Plant
has been successfully submitted!
To increase your chances of getting shortlisted, we recommend completing your profile.
Employers prioritize candidates with full profiles, and a completed profile could set you apart in the
selection process.
Why complete your profile?
Higher Visibility: Complete profiles are more likely to be viewed by employers.
Better Match: Showcase your skills and experience to improve your fit.
Stand Out: Highlight your full potential to make a stronger impression.
Complete your profile now to give your application the best chance!